The County took over this township road and only added BASE ONE® to the north 1/2 mile. They wanted to do a test section to see if they could see a benefit with the addition of BASE ONE®. The original plan was to add BASE ONE® to the south 1/2 mile. However, when construction started, they felt the north 1/2 mile had inferior material, so it was decided to add the BASE ONE® to the north 1/2 mile section.
American Engineering & Testing, Inc. conducted testing in November 2016. Test results are as follows: