Project Profile #2

Project Details

An original design was 6” of Superpave FAA45 over 18” aggregate base on top of 12” cement treated subgrade (SN=3.96).
A Value Engineering Proposal was accepted with a new design of 6” Superpave FAA45 over 8” stabilized aggregate base with BASE ONE® on top of 12” cement treated base (SN=4.68).

 

Project Test Results

By eliminating 10″ of aggregate base, the customer was able to save approximately $2,000,0000 on this 11.5 mile project. Below are a chart of the results: